Home » Others » Past tenders

PAST TENDERS

S.no

Tender No

Name Of Work

Bid Document
Downloading Start Date

Bid Document
Downloading End Date

Last Date &
Time for
Receipt of Bids

1

17/2013-14/EE-III/VUDA, DT. 4-12-2013 Construction of Indoor Stadium at Tuni, East Godavari. ( 2nd call ) 4/12/2013 8:00PM 21/12/2013 1:00PM 21/12/2013 3:00PM

2

13/2013-14/EE-I/VUDA, DT.13-9-2013 Providing infrastructure development works - Roads, Drains and Water supply arrangement in the proposed layout in S.No. 155/3P, 4P of Paradesipalem Village. 13/9/2013 8:00PM 30/9/2013 1:00PM 30/9/2013 3:00PM

3

18/2013-14/EE-II/VUDA, DT. 13-9-2013 Construction of Daises in the earmarked lawns at Old MGM Site, VUDA Park 13/9/2013 8:00PM 27/9/2013 1:00PM 27/9/2013 3:00PM

4

12/2013-14/EE-1/VUDA, DT. 11-9-2013 Construction of Additional Class room with Toilet Block for Women's at Dr.V.S.Krishna College, Visakhapatnam 11/9/2013 8:00PM 28/9/2013 1:00PM 28/9/2013 3:00PM

5

12/2013-14/EE-III/VUDA, DT. 12-9-2013 Renovation of Ananda Gajapathi Auditorium, Vizianagaram (Civil Works)(2ND CALL). 12/9/2013 8:00PM 30/9/2013 1:00PM 30/9/2013 3:00PM

6

11/2013-14/EE-VI/VUDA, DT. 13-9-2013 Providing Pipes, Motors to Bores & Distribution Pipelines to External Jogging Track at Dr YSR VUDA Central Jail Premises, Old Central Jail Premises, Visakhapatnam (2ND CALL) 13/9/2013 8:00PM 21/9/2013 1:00PM 21/9/2013 3:00PM

7

10 /2013-14/EE-I/VUDA, Dt. 6-09-2013 Construction of Storm Water Drains to the Master Plan 80'-0" wide road from Car Shed Jn., (NH-5) to Pothinamallayya Palem at Madhurawada, Visakhapatnam. (2ND CALL) 6/9/2013 8:00PM 23/9/2013 1:00PM 23/9/2013 3:00PM

8

10/2013-14/EE-I/VUDA, DT. 6-9-2013 Construction of CD works & Central Divider and formation of BT Road (Balance Bit) to the Master Plan 80'-0" wide road from Car Shed Jn., (NH-5) to Pothinamallayya Palem at Madhurawada, Visakhapatnam (2ND CALL) 6/9/2013 8:00PM 23/9/2013 1:00PM 23/9/2013 3:00PM

9

11/2013-14/EE-I/VUDA, DT. 6-9-2013 Providing RCC Fencing Poles with Barbed Wire and Providing Caution Boards for Protection of Govt. Lands In S.Nos. 17,18,20,21,25,27 & 32 in Vepagunta village, Pendurthi Mandal. (2nd call) 6/9/2013 8:00PM 16/9/2013 1:00PM 16/9/2013 3:00PM

10

12/2012-13/EE-II/VUDA,
dt. 20-2-2013

Formation of Quarry Rubbish with SDBC roads including protection works connecting approach road of NH and residential area on Railway track side adjacent to Sheshu Gedda at Yelamanchili ( 2ND CALL )

20/2/2013 8:00PM

7/3/2013 1:00PM

7/3/2013 3:00PM

11

14/2012-13/EE-I/VUDA,
Dt. 20-2-2013

Supply and laying of underground cable in the Dr. Y.S.R. Park at Old Central Jail Premises at visakhapatnam. (3RD CALL)

20/2/2013 8:00PM

7/3/2013 1:00PM

7/3/2013 3:00PM

12

22/2012-13/EE-III/VUDA, Dt.15-2-2013

Widening and providing VDF cement concrete including construction of SW drains for Chinna Bazaar - Illisipuram at Srikakulam.(6TH CALL)

18/2/2013 5:00PM

6/3/2013 1:00PM

6/3/2013 3:00PM

13

33/2012-13/EE-IV/VUDA, Dt.11-2-2013

Construction of Gallery in front of International Skating Rink at Phase-III, VUDA Park. (Balance work)

11/2/2013 6:00PM

27/2/2013 1:00PM

27/2/2013 3:00PM

14

15/2012-13/EE-I/VUDA,
Dt.5-2-2013

Renovation of Pavilion block and providing roof to the gallery at Indira Priyadarshini stadium behind Poornamarket, Visakhapatnam. (2nd call)

5/2/2013 6:00PM

20/2/2013 1:00PM

20/2/2013 3:00PM

15

11/2012-13/EE-II/VUDA,
dt. 24-1-2013

Formation of Quarry Rubbish with SDBC roads including protection works connecting approach road of NH and residential area on Railway track side adjacent to Sheshu Gedda at Yelamanchili

24/1/2013 5:00PM

12/2/2013 1:00PM

12/2/2013 3:00PM

16

5/2012-13/EE-V/VUDA,
Dt. 24-1-2013

Providing Annual Maintenance to the Record Room for Treatment of Rodent, Cockroaches and Silver Fish at 3rd floor "C" Block at UB Complex, Siripuram Jn., Visakhapatnam.

24/1/2013 5:00PM

7/2/2013 1:00PM

7/2/2013 3:00PM

17

4/2012-13/EE-V/VUDA,
dt. 18-1-2013

Providing Collapsible Gates at Ground Floor Main Entrance of the Block - "B" UB Complex at Siripuram Jn., Visakhapatnam.

18/1/2013 5:00PM

28/1/2013 1:00PM

28/1/2013 3:00PM

18

30/2012-13/EE-IV/VUDA, Dt.17.1.2013

Providing Renovation of the existing Old Building Roof Area and View Point by the side of the new Scooter Parking Area on top of the Kailasa Hill. (2nd call)

17/1/2013 6:00PM

31/1/2013 1:00PM

31/1/2013 3:00PM

19

03/2012-13/EE-V/VUDA,
dt. 9-1-2013

Providing Anti Termite Treatment to Record Room at 3rd floor "C" Block at UB Complex, Siripuram Jn., Visakhapatnam

9/1/2013 6:00PM

17/1/2013 1:00PM

17/1/2013 3:00PM

20

28/2012-13/EE-IV/VUDA,
DT. 8-1-2013

Annual Maintenance and operation of Kurusura Submarine Museum from 01.02.2013 to 31.01.2014.

8/1/2013 5:00PM

22/1/2013 1:00PM

22/1/2013 3:00PM

21

14/2012-13/EE-I/VUDA,
Dt.4-1-2013

Renovation of Pavilion block and providing roof to the gallery at Indira Priyadarshini stadium behind Poornamarket, Visakhapatnam.

4/1/2013 8:00PM

18/1/2013 1:00PM

18/1/2013 3:00PM

22

11/2012-13/EE-VI/VUDA,
Dt.7-1-2013

Construction of DDRC Building at Vizianagaram. ( 2ND CALL )

7/1/2013 8:00PM

21/1/2013 1:00PM

21/1/2013 3:00PM

23

13/2012-13/EE-I/VUDA,
Dt. 1-1-2013

Supply and laying of underground cable in the Dr. Y.S.R. Park at Old Central Jail Premises at visakhapatnam. (2ND CALL)

1/1/2013 8:00PM

17/1/2013 1:00PM

17/1/2013 3:00PM

24

14/2012-13/EE-I/VUDA,
Dt.4-1-2013

Renovation of Pavilion block and providing roof to the gallery at Indira Priyadarshini stadium behind Poornamarket, Visakhapatnam.

4/1/2013 8:00PM

18/1/2013 1:00PM

18/1/2013 3:00PM

25

12/2012-13/EE-I/VUDA,
Dt. 2-1-2013

Providing RCC Hume pipes and Manhole chambers at crossings for Electrical, Water supply and storm water drains in Dr.Y.S.R. VUDA Central Park Old Central Jail premises, Visakhapatnam.

2/1/2013 5:00PM

17/1/2013 1:00PM

17/1/2013 3:00PM

26

11/2011-12/EE-I/VUDA,
Dt.21-12-2012

Construction of Public Toilets in Dr.Y.S.R. VUDA Central Park Old Central Jail premises, Visakhapatnam.

22/12/2012 8:00PM

7/1/2013 1:00PM

7/1/2013 3:00PM

27

27/2012-13/EE-IV/VUDA, Dt.31.12.2012

Construction of New Toilet Blocks for Gents & Ladies on top of the Kailasa Hill. (2ND CALL)

31/12/2012 5:00PM

8/1/2013 1:00PM

8/1/2013 3:00PM

28

10/2012-13/EE-VI/VUDA, Dt.29-12-2012

Construction of 2 Nos. of Toilet Blocks at Ananda Gajapathi Auditorium, Vizianagaram.( Recall )

29/12/2012 5:00PM

7/1/2013 1:00PM

7/1/2013 3:00PM

29

20/2012-13/EE-III/VUDA,
Dt.1-1-2013

Widening and providing VDF cement concrete including construction of SW drains for Chinna Bazaar - Illisipuram at Srikakulam.(5TH CALL)

2/1/2013 5:00PM

17/1/2013 1:00PM

17/1/2013 3:00PM

30

05/2012-13/EE-VIII/VUDA,

DT. 29-12-2012

Supply, delivery and erection of 4Nos. of 16.5 TR duct able split AC OD units with scroll compressors and 2Nos., of 13200 CFM double skin AHUs to Telugu Museum at Kailasagiri

29/12/2012 5:00PM

7/1/2013 1:00PM

7/1/2013 3:00PM

31

28/2012-13/EE-IV/VUDA, Dt.28-12-2012

Improvement of Lighting arrangements to Skating Rink at VUDA Park.

28/12/2012 8:00PM

17/1/2013 1:00PM

17/1/2013 3:00PM

32

09/2012-13/EE-VI/VUDA, Dt.14-12-2012

Construction of DDRC Building at Vizianagaram.

14/12/2012 5:00PM

28/12/2012 1:00PM

28/12/2012 3:00PM

33 

19/2012-13/EE-III/VUDA,Dt.14-12-2012

Construction of DDRC Building at Srikakulam.

14/12/2012 5:00PM

28/12/2012 1:00PM

28/12/2012 3:00PM

34

27/2012-13/EE-IV/VUDA, Dt.13.12.2012

Construction of New Toilet Blocks for Gents & Ladies on top of the Kailasa Hill.

13/12/2012 5:00PM

27/12/2012 1:00PM

27/12/2012 3:00PM

35

10/2011-12/EE-I/VUDA,

Dt. 10-12-2012

Supply and laying of underground cable in the Dr. Y.S.R. Park at Old Central Jail Premises at Visakhapatnam.

10/12/2012 8:00PM

24/12/2012 1:00PM

24/12/2012 3:00PM

36

08/2012-13/EE-VI/VUDA, Dt.06-12-2012

Construction of 2 Nos. of Toilet Blocks at Ananda Gajapathi Auditorium, Vizianagaram.

6/12/2012 5:00PM

14/12/2012 1:00PM

14/12/2012 3:00PM

37

19/2012-13/EE-VII/VUDA,Dt. 7.12.2012

Construction of Entrance Arch at Hanumanthuwaka (2nd call)

7/12/2012 8:00PM

14/12/2012 1:00PM

14/12/2012 3:00PM

38

04/2012-13/EE-VIII/VUDA, Dt:01-12-012.

Providing Pathways alround main dome building and supply and fixing of ornamental entrance gates to Telugu Museum at Kailasagiri.

01-12-2012 8:00PM

10-12-2012 1:00PM

10-12-2012 3:00PM

39

04/2012-13/EE- VIII/VUDA,

Dt. 01-12-2012

Formation of Alternate Road to KAILASAGIRI from old GLIDER point to TELUGU MUSEUM junction along the hill slopes down the Railway track

1-12-2012 8:00PM

10-12-2012 1:00PM

10-12-2012 3:00PM

40

04/2012-13/EE-VIII/VUDA, Dt.01-12-2012

Providing GSB, WMM, SDBC layers to Kailasagiri hill top road from Railway track to Telugu Museum

1-12-2012 8:00PM

10-12-2012 1:00PM

10-12-2012 3:00PM

41

04/2012-13/EE-VIII/VUDA, Dt.01-12-2012

Providing GSB, WMM, SDBC layers to Kailasagiri hill top road from Railway track to Telugu Museum

1-12-2012 8:00PM

10-12-2012 1:00PM

10-12-2012 3:00PM

42

26/2012-13/EE-IV/VUDA, Dt.27.11.2012

Improvement of Lighting arrangements along periphery all round the Toy Train Track including opened up areas on Kailasagiri.

30-11-2012 8:00PM

14-12-2012 1:00PM

14-12-2012 3:00PM

43

17/2012-13/EE-VII/VUDA,Dt.29.11.2012

Construction of Model Toilet at Health Arena Foot Hill of Kailasa Hill. (2nd CALL )

30-11-2012 5:00PM

7-12-2012 1:00PM

7-12-2012 3:00PM

44

17/2012-13/EE-III/VUDA, Dt.24-11-2012

Construction of Indoor Stadium at Bheemunipatnam in Visakhapatnam. (2nd call)

24-11-2012 5:00PM

10-12-2012 1:00PM

10-12-2012 3:00PM

45

18/2012-13/EE III/VUDA,
Dt.29-11-2012

Widening and providing VDF cement concrete including construction of SW drains for Chinna Bazaar - Illisipuram at Srikakulam.(Recall)

29/11/2012 5:00PM

14/12/2012 1:00PM

14-12-2012 3:00PM

46

Rc. No.2932/06/UFD/M1/VUDA
dt. 29-11-2012

Landscaping in front of main gate on either side of Central gate, Avenue plantation and Shade grass dibbling at silent zone and on right side slope area from gym arena up to the end of phase – I during the year 2012-13

30-11-2012 5:00PM

07-12-2012 2:00PM

07-12-2012 3:00PM

47

Rc. No.7984/2008/UFD/M1/VUDA dt.26-10-2012

Maintenance of landscape and plantation in the premises of VSEZ, Visakhapatnam during the year 2012-13 (3 months from January, 2013 to March, 2013), Visakhapatnam.

29-10-2012 5:00PM

15-11-2012 1:00PM

15-11-2012 3:00PM

48

01/2012-13/EE-V/VUDA,Dt:29-09-2012

Dismantling and reconstruction of Post Office Building over the existing Shops at Sagarnagar, Visakhapatnam.

29/9/2012 5:00PM

15/10/2012 1:00PM

15/10/2012 3:00PM

49

08/2012-13/EE-Div II/VUDA,Dt.28-09-2012

Construction of Security Room at Kurmannapalem Housing Scheme Phase-VI, Visakhapatnam.

28/9/2012 6:00PM

16/10/2012 1:00PM

16/10/2012 3:00PM

50

06/2012-13/EE-II/VUDA,Dt.24-09-2012

Construction of RCC culvert and CC drain for 80'-0" approach road at Pharmacity E-Bonangi Village, R.H.Colony at Parawada Mandal, Visakhapatnam (Dist.)

24/9/2012 8:00PM

10/10/2012 1:00PM

10/10/2012 3:00PM

51

07/2012-13/EE- II/VUDA,Dt.24-09-2012

Laying of BT surface for 80-0 approach road at Pharmacity E-Bonangi Village, R.H.Colony at Parawada Mandal, Visakhapatnam (Dist.)

24/9/2012 8:00PM

10/10/2012 1:00PM

10/10/2012 3:00PM

52

01/2012-13/EE-V/VUDA,Dt:29-09-2012

Dismantling and reconstruction of Post Office Building over the existing Shops at Sagarnagar, Visakhapatnam.

29/9/2012 5:00PM

15/10/2012 1:00PM

15/10/2012 3:00PM

53

08/2012-13/EE-Div II/VUDA,Dt.28-09-2012

Construction of Security Room at Kurmannapalem Housing Scheme Phase-VI, Visakhapatnam.

28/9/2012 6:00PM

16/10/2012 1:00PM

16/10/2012 3:00PM

54

06/2012-13/EE-II/VUDA,Dt.24-09-2012

Construction of RCC culvert and CC drain for 80'-0" approach road at Pharmacity E-Bonangi Village, R.H.Colony at Parawada Mandal, Visakhapatnam (Dist.)

24/9/2012 8:00PM

10/10/2012 1:00PM

10/10/2012 3:00PM

55

07/2012-13/EE- II/VUDA,Dt.24-09-2012

Laying of BT surface for 80-0 approach road at Pharmacity E-Bonangi Village, R.H.Colony at Parawada Mandal, Visakhapatnam (Dist.)

24/9/2012 8:00PM

10/10/2012 1:00PM

10/10/2012 3:00PM

56

16/2012-13/EE-IV/VUDA, Dt.28.08.2012

Providing parking facilities at VUDA Park (phase-III)

29/8/2012 5:00PM

20/9/2012 1:00PM

20/9/2012 3:00PM

57

07/2012-13/EEVII/VUDA, Dt.27-08-2012

Providing WBM & BTSD Surface for the Chinamushidiwada I.R.W.O, Layout

27/8/2012 6:00PM

17/9/2012 1:00PM

17/9/2012 3:00PM

58

128/2210/UFD/M1/VUDA
Dt.30-08-2011

Raising of Afforestation works i.e., Raising of plantations place like Avenue plantation 5000 Nos. at Main road side roads and park areas and bamboo plantations (300Nos) works at Paradesiplaem Layouts under land pooling scheme (Ozon valley)

05/09/2011 10:30AM

20/9/2011
3:00PM

21/9/2011 4:00PM

59

05/2011-2012/EE-IV/VUDA

Construction of retaining wall to regulate gedda in MVP colony, Visakhapatnam.

20/8/2011 8:00PM

3/9/2011
1:00PM

3/9/2011 3:00PM

60

2/2011-12/EE VIII/VUDA,
Dt.18-08-2011

Providing GSB, WMM, SDBC to roads of VUDA Layout opp to Haritha Project at Madhurawada.

19/8/2011 12:00PM

3/9/2011
1:00PM

21/07/2011 4:00PM

61

2/2011-12/EE VIII/VUDA,
Dt.18-08-2011

Providing GSB, WMM, SDBC to roads of Cyber Valley layout Sectors I & II of Madhurawada area.

18/8/2011 7:00PM

3/9/2011
1:00PM

3/9/2011 3:00PM

62

2/2011-12/EE VIII/VUDA,
Dt.18-08-2011

Providing CC Drains & CD Works to VUDA Layout opp to Haritha Project at Madhurawada

18/8/2011 7:00PM

3/9/2011
1:00PM

3/9/2011 3:00PM

63

2/2011-12/EE VIII/VUDA,Dt.17-08-2011

Providing CC Drains & CD works to Cyber Valley layout Sectors I & II of Madhurawada area

18/8/2011 7:00PM

3/9/2011
1:00PM

3/9/2011 3:00PM

64

4/2011-12/EE-VI/VUDA,Dt.28-06-2011

Supply of Manpower i.e., semi skilled electricians, fire fighting operators, lift operators, Engineering Assistant and electrical helpers to work in the office of VUDA.

28/6/2011 7:00PM

6/7/2011 1:00PM

6/7/2011 3:00PM

65

2/2011-12/EE-VI/ VUDA,Dt.27-06-2011

Shifting of HT & LT Electrical lines including transformers from Car Shed to Pothinamallayyapalem last Bus stop.

27/6/2011 1:00PM

11/7/2011 1:00PM

11/7/2011 3:00PM

66

1/2011-1/EE-VIII/VUDA, dt.18-6-2011

Providing External and Internal Electrification to the Row Housing Scheme at Rushikonda

18/6/2011 1:00PM

30/6/2011 1:00PM

30/6/2011 3:00PM

67

1/2011-12/CE/EEIII/VUDA,dt.18-6-2011

Construction of proposed New Block for Department of Botany, Zoology at A.V.N. College campus, Visakhapatnam

18/6/2011 1:00PM

25/6/2011 1:00PM

30/6/2011 3:00PM

68

4/2011-12/EE-II/VUDA, Dt:2-6-11

Construction of toilet blocks, compound wall and sanitary arrangements at Bheemunipatnam

2/6/2011 5:00PM

13/6/2011 1:00PM

13/6/2011 3:00PM

69

4/2011-12/EE-II/VUDA, Dt:2-6-2011

Formation of CC Road and Drain near Agros and Revenue Home side at Vizianagaram

2/6/2011 5:00PM

13/6/2011 1:00PM

13/6/2011 3:00PM

70

1/2011-12/CE/EEIII/VUDA,dt.26-5-2011

Construction of proposed New Block for Department of Botany, Zoology at A.V.N. College campus, Visakhapatnam

26/5/2011 4:00PM

9/6/2011 1:00PM

9/6/2011 3:00PM

71

1/2011-1/EE-VIII/VUDA, dt.30-5-2011

Providing External and Internal Electrification to the Row Housing Scheme at Rushikonda

30/5/2011 6:00PM

9/6/2011 1:00PM

9/6/2011 3:00PM

72

3/2011-12/EE-II/VUDA, Dt:6-5-2011

Construction of Retaining wall of 80'-0" road at Arasavalli Jn., to Collector Office Junction

6/5/2011 4:30PM

13/5/2011 1:00PM

13/5/2011 3:00PM

73

3/2011-12/EE-II/VUDA, Dt:6-5-2011

Construction of Pylon of 'Galimedalu' including sculptures & Muruls work and Civil works at Bheemunipatnam

6/5/2011 4:00PM

13/5/2011 1:00PM

13/5/2011 3:00PM

74

1/2011-12/EE-II/VUDA, Dt:4-5-2011

Repairs and reconstruction of retaining wall with RR Masonry along the Beach road at Bheemunipatnam

4/5/2011 2:00PM

12/5/2011 1:00PM

12/5/2011 3:00PM

75

1/2011-12/EE-II/VUDA, Dt:4-5-2011

Repairs and reconstruction of retaining wall with RR Masonry along the Beach road at Bheemunipatnam

4/5/2011 2:00PM

12/5/2011 1:00PM

12/5/2011 3:00PM

76

3/2011-12/EE-V/VUDA

Annual Maintenance of Gurajada Kalakshetram and Children Theatre premises (Civil, Electrical and Greenery works including Mini Zoo along with security arrangements) at Siripuram, Visakhapatnam

4/5/2011 1:00PM

12/5/2011 1:00PM

12/5/2011 3:00PM

77

3/2011-12/EE-V/VUDA, Dt:3-5-2011

Annual Maintainance (Civil) of VUDA offices located in U.B.Complex A, B & C Blocks including Power Room Building and Camp office of Vice Chairman at Pandurangapruam.

4/5/2011 1:00PM

12/5/2011 1:00PM

12/5/2011 3:00PM

78

1/2011-12/EE-II/VUDA,
Dt.2-5-2011

Widening of Existing Road from Balaji Complex Jn., to Thotapalem at Vizianagaram

2/5/2011 1:00PM

12/5/2011 1:00PM

12/5/2011 3:00PM

79

17/2010-11/EE VI/VUDA,
Dt. 23-3-2011

Providing water supply arrangements - Laying of Distribution System, Construction of ELSR of 350KL, Sump of 100 KL Capacity, Drilling of bore wells, Motors, Pumpsets etc., in Sector -I & II of Phase - I in Land Pooling Project at Paradesipalem.

24/3/2011 4:00PM

8/4/2011 1:00PM

8/4/2011 3:00PM

80

1/2010-11/EE-VIII/VUDA,
Dt.23-3-2011

Construction of Security Room, entrance gates ways, peripheral compound wall and drain to Row Housing Scheme (Gated Community) at Rushikonda Layout

24/3/2011 4:00PM

30/3/2011 1:00PM

30/3/2011 3:00PM

81

17/2010-11/EE-VI/VUDA,
Dt.23-3-2011

Construction of S.W. Drains, CD works and Protection works in Sector -II of Phase - I in Land Pooling Project at Paradesipalem

24/3/2011 4:00PM

8/4/2011 1:00PM

8/4/2011 3:00PM

82

17/2010-11/EE-VI/VUDA,
Dt:23-3-2011

Construction of S.W. Drains, CD works and Protection works in Sector- I of Phase - I in Land Pooling Project at Paradesipalem

24/3/2011 4:00PM

8/4/2011 1:00PM

8/4/2011 3:00PM

83

7/2010-11/EE-II/VUDA,
Dt: 23-3-2011

Widening of Existing Road from Balaji Complex Jn., to Thotapalem at Vizianagaram

23/3/2011 7:00PM

8/4/2011 1:00PM

8/4/2011 3:00PM

84

06/2012-12/EEVII/VUDA,
Dt.01.08.2012

Construction of Main Entrance Arch at Beach Road to Health Arena, Kailasa Hill.

7/8/2012 8:00PM

17/8/2012 1:00PM

17/8/2012 3:00PM

85

11/2012-13/EE-IV/VUDA,
Dt.01.08.2012.

Providing Hydro Pneumatic Pumping System including Pipeline, 100KL RCC Sump and supporting works for comprehensive Water Supply facility to Kailasa Hill, Visakhapatnam.

1/8/2012 8:00PM

21/8/2012 3:00PM

21/8/2012 4:00PM

86

06/2012-13/EEIII/VUDA, Dt.28-07-2012

Providing Internal Walk ways, AXIAL Pathway, Central Avenue, Central Plaza, Cycling track and Administrative Building, Ticket Room in Dr.Y.S.R. VUDA Central Park, Old Central Jail premises at Visakhapatnam. (2nd call)

28/7/2012 8:00PM

6/8/2012 1:00PM

6/8/2012 3:00PM

87

10/2012-13/EEIII/VUDA, Dt.26-07-2012

Providing GSB, WMM, BT surface SW Drains & Central Divider to the road connecting Arasavalli Jn. to Collector's office at Srikakulam

26/7/2012 5:00PM

13/8/2012 1:00PM

13/8/2012 3:00PM

88

09/2012-13/EEIII/VUDA,
Dt.23-07-2012

Widening and Providing GSB, WMM and BT surface Construtcion of including Side Drains to the road from Chinnabazaar to Illisipuram at Srikakulam

23/7/2012 8:00PM

9/8/2012 1:00PM

9/8/2012 3:00PM

89

04/2012-2013/EE-VI/VUDA,
Dt:23-07-2012

Supply and fixing of 61 Nos. of 12V 65AH SMF batteries to 10 KVA UPS at South & North Wings of 7th Floor and South Wing of 8th Floor of UB Complex, Siripuram Jn., Visakhapatnam.

23/7/2012 8:00PM

31/7/2012 1:00PM

31/7/2012 3:00PM

90

.7984/2008/UFD/M1/VUDA
Dt.07-07-2012

Maintenance of landscape and plantation in the premises of VSEZ, Visakhapatnam during the year 2012-13.

21-7-2012 8:00PM

6-8-2012 2:00PM

6-8-2012 3:00PM

91

08/2012-13/EEIII/VUDA,
Dt.03-07-2012

Providing Road widening from Railway water tank to Gedevanipalem at Amadalavalasa Municipality, Srikakulam.

3/7/2012 8:00PM

18/7/2012 1:00PM

18/7/2012 3:00PM

92

10/2012-13/EE-IV/VUDA, Dt.26.06.2012

Providing Special Repairs to Ladies & Gents Toilet Block, backside of Food Court at Kailasagiri. ( 3rd call )

26/6/2012 5:00PM

4/7/2012 1:00PM

4/7/2012 3:00PM

93

03/2012-13/EEIII/VUDA, Dt.18-06-2012

Widening of Ring Road to 100'-0" wide and construction of SW drains, Central Median from Balaji Junction to Dasannapeta Junction at Vizianagaram

18/6/2012 9:00PM

11/7/2012 1:00PM

11/7/2012 3:00PM

94

04/2012-13/EEIII/VUDA, Dt.18-06-2012

Providing Road widening from Railway water tank to Gedevanipalem at Amadalavalasa Municipality, Srikakulam.

18/6/2012 9:00PM

11/7/2012 1:00PM

11/7/2012 3:00PM

95

06/2012-13/EEIII/VUDA, Dt.18-06-2012

Supply and laying of 110mm dia HDPE pipe line including shifting of existing pipeline along the approach road leading to RIMS Hospital at Srikakulam

18/6/2012 9:00PM

26/6/2012 1:00PM

26/6/2012 3:00PM

96

Rc. No.67/2010/UFD/M1/VUDA
Dt.16-06-2012

Maintenance of Avenue and Block plantation of Tata Memorial Hospital at Aganampudi, Visakhapatnam (3900 Nos) during the year 2012-13

21-6-2012 2:00PM

09-7-2012 3:00PM

09-7-2012 4:00PM

97

01/2012- 13/EE-I/VUDA,
Dt.16-06-2012

Beautification of Beach Road from Sri RS RK Ranga Rao Memorial Statue to Police Martyrs Memorial Statue at Visakhapatnam

16/6/2012 8:00PM

30/6/2012 1:00PM

30/6/2012 3:00PM

98

05/2012-13/EEVII/VUDA, Dt.16.06.2012

Construction of RR Masonry for supporting / Raising /Toe Walls and providing Revetment with Dry Stone in VUDA Health Arena at Foot Hill of Kailasagiri

16/6/2012 8:00PM

30/6/2012 1:00PM

30/6/2012 3:00PM

99

05/2012-13/EEVII/VUDA, Dt.16.06.2012

Construction of Revetment Drain with Dry Stone and Grouting with CC(1:3:6) and providing Ornamental Hand Railing (Bamboo Design) on southern side of Health Arena at Foot of Kailasagiri.

16/6/2012 8:00PM

30/6/2012 1:00PM

30/6/2012 3:00PM

100

02/2012-13/EE-VI/VUDA, Dt:16-06-2012

Providing Central Street Lighting from IT SEZ Jn., to Mangammaripeta along the Visakhapatnam - Bheemili Beach Road

16/6/2012 8:00PM

2/7/2012 1:00PM

2/7/2012 3:00PM

101

05/2012-13/EEIII/VUDA,
Dt.15-06-2012

Providing Internal Walk ways, AXIAL Pathway, Central Avenue, Central Plaza, Cycling track and Administrative Building, Ticket Room in Dr.Y.S.R. VUDA Central Park, Old Central Jail premises at Visakhapatnam.

15/6/2012 8:00PM

9/7/2012 1:00PM

9/7/2012 3:00PM

102

02/2012-13/EE- VIII/VUDA,
Dt.14-06-2012

Providing cabling for telephone & intercom and internet including junction boxes Row Housing Scheme at Rushikonda

15/6/2012 8:00PM

22/6/2012 1:00PM

22/6/2012 3:00PM

103

01/2012-13/EEVI/VUDA,
Dt.14-06-2012

Providing Special Repairs and certain development works at TRAINING CUM PRODUCTION CENTRE, APVCC, Visakhapatnam near Navodaya School.

15/6/2012 6:00PM

30/6/2012 1:00PM

30/6/2012 3:00PM

104

3/2012-13/EE-V/VUDA,
Dt:13-06-2012

Annual Maintenance (Civil) of VUDA offices located in U.B. Complex A, B & C Blocks including Power Room Building, Gurajada Kalakshetram, Children Arena including Greenery, Mini Zoo and Camp office of Vice Chairman, VUDA at Pandurangapruam

13/6/2012 9:00PM

27/6/2012 1:00PM

27/6/2012 3:00PM

105

09/2012-13/EE-IV/VUDA, Dt.13.05.2012

Widening of existing B.T.Road and Gradient correction at Glider Point at 1st curve along Ghat Road of Kailasa Hill (2nd Call)

13/6/2012 8:00PM

21/6/2012 1:00PM

21/6/2012 3:00PM

106

03/2012-13/EEII/VUDA, Dt.30-05-2012

Laying of BT surface and construction of RCC culvert for 80-0 approach road at Pharmacity E-Bonangi Village, R.H.Colony at Parawada Mandal, Visakhapatnam (Dist.)(2nd call)

13/6/2012 6:00PM

27/6/2012 1:00PM

27/6/2012 3:00PM

107

08/2012-13/EE-IV/VUDA,
Dt.13.06.2012.

Widening of Existing B.T.Road from Telugu Museum, upto Railway Track on top of Kailasa Hill.( 4th call )

13/6/2012 8:00PM

21/6/2012 1:00PM

21/6/2012 3:00PM

108

07/2012-13/EE-IV/VUDA,
Dt.7.06.2012

Providing Special Repairs to Ladies & Gents Toilet Block, backside of Food Court at Kailasagiri. ( 2nd call )

7/6/2012 5:00PM

13/6/2012 1:00PM

13/6/2012 3:00PM

109

01 /2012-13/EE- I/VUDA,
Dt.26-05-2012

Protection of reinforcement in RCC elements - Construction of Housing Project at Madhurawada,Phase-I

26/5/2012 8:00PM

1/6/2012 1:00PM

1/6/2012 3:00PM

110

07/2012-13/EEIII/VUDA, Dt.16-08-2012

Providing Internal Walk ways, AXIAL Pathway, Central Avenue, Central Plaza, Cycling track and Administrative Building, Ticket Room in Dr.Y.S.R. VUDA Central Park, Old Central Jail premises at Visakhapatnam. (3rd call)

16/8/2012 8:00PM

31/8/2012 1:00PM

31/8/2012 3:00PM

111

14/2012-13/EE-IV/VUDA, Dt.09.08.2012

Raising of Compound wall and providing Circular type Fencing at north side of VUDA Park Phase-III (Navy Side).

9/8/2012 8:00PM

27/8/2012 1:00PM

27/8/2012 3:00PM

112

15/2012-13/EE-IV/VUDA, Dt.09.08.2012

Providing Chain Link Mesh at Entrance Arch on both sides of the road on top of the Kailasa Hill.

9/8/2012 8:00PM

27/8/2012 1:00PM

27/8/2012 3:00PM

113

12/2012-13/EE-IV/VUDA,Dt.09.08.2012

Providing G.I. Hand Railing and Special Repairs by the side new Scooter Parking on top of the Kailasa Hill

9/8/2012 5:00PM

27/8/2012 1:00PM

27/8/2012 3:00PM

114

13/2012-13/EE-IV/VUDA, Dt.09.08.2012

Providing Special Repairs to the Entrance of the Existing Petty Shops, near Rail Track on top of Kailasa Hill

9/8/2012 5:00PM

27/8/2012 1:00PM

27/8/2012 3:00PM

115

11/2012-13/EEIII/VUDA, Dt.08-08-2012

Construction of Indoor Stadium at Bheemunipatnam in Visakhapatnam.

8/8/2012 5:00PM

24/8/2012 1:00PM

24/8/2012 3:00PM